GitHub Projects process#

Overview#

  • We use GitHub projects to track progress on individual components/products/services

  • The entrypoint to preview available projects is Causify-ai GitHub Projects TODO(Juraj): this link will work only for people who are directly members of the organization (not collaborators)

GH project structure#

  • A GH project represents a long-term project that is composed of GH Issues, executed by multiple team members according to Sprints

  • Each GH project window consists of tabs called "views"

  • A view can provide a specific perspective on the issues in the project, e.g., filter certain issues by their attributes, visualize them in a board/list

  • We use a base template for all of our projects to ensure consistency between projects

  • The base template consists of the following views:

    • All issues: provides a table view of all issues present in the project
    • Current sprint: provides a table view of issues in the currently running sprint
    • Next sprint: provides a table view of issues in the next sprint
    • Backlog: list of a non-finished issues in a given project without a sprint assigned
    • Team capacity: aggregates "estimate point" for each collaborator in the project

Issue fields#

  • Each view within a project contains specific fields:

    • Assignee
      • Names of people the issue is assigned to
    • Status
      • What phase of the development the issue is in
      • We have 7 status options available that should be in sync within all projects
        • Todo (This item hasn't been started)
        • In Progress (This is actively being worked on)
        • Paused (Work was paused)
        • Done (This has been completed)
        • In Review (This is awaiting review or validation)
        • PR back to author (Author needs to apply review feedback)
        • QA (Change being tested in QA)
    • Label (Bug, P0, P1)
    • Estimate in terms of "uninterrupted hours of work"
      • What is the issues' estimated implementation difficulty
      • We want to become good at estimating complexity and overcome being uncomfortable in providing ETAs
      • Estimating complexity in terms of hours of work is done to the best of our ability acknowledging that higher priority issues come up, we get interrupted sometimes, debugging or implementing a feature might take more time than expected
      • We are ok with doing our best to estimate and we are ok failing to meet our expectations, so that we can learn and improve
    • Sprint
      • Which weekly sprint this issue belongs to
    • Linked Pull Request
      • The pull requests linked to the specific issue
  • It's possible to add new fields; the list above includes some of the agreed upon fields shared across all projects

How to set up a new project#

  • Click on Projects tab in the desired repository, e.g. causify-ai/cmamp

  • Click on the green New Project button

  • A new window with a pop-up should appear, in the pop-up choose Project templates > From your organization and choose ** [TEMPLATE] Causify Project**

  • Change the default name @yourusername untitled project to a relevant name

    • The name should be short and representative of what needs to be done
    • Ideally we want to complete a Project in 2-3 months, since we don't want to have long-running projects linger forever on the board. Each project should have a clear goal
    • Long-running projects should be broken in smaller projects to show and measure progress
    • If a project can't be easily described in a phrase starting with a verb, it means that the scope is too big
    • Good names are:
      • "CustomerXYZ Proof-of-concept", e.g., "ITSavvy Proof-of-concept"
      • "Split cmamp into separate repos"
      • "FAR trading"
      • "Implement v0.1 of XYZ", "Deploy XYZ", ...
    • Bad names are:
      • "Config". A better name is "Make config robust" or "Config - Q1-2024 Goals"
  • Click on the Project details button in the upper right corner next to the three dots ...

    • Provide a short description of the project, e.g., who is the customer
    • What is the overarching goal of the project
    • Who is the team leader
    • Provide links to the key resources (Slack/Asana channel)
  • Add team members to the project

    • Click on the three dots ... (View more button) and go to Settings > Manage access > Invite collaborators
    • Set write access if you want a team member to be able to add new issues to the project and manage the state of the issues
  • Open Slack and create a channel for the project

    • The naming convention is proj-<<project-name>>
    • The Slack channel is used to communicate with the team working on that project, using our conventions of what's so urgent to require an IM
    • Click on Add Canvas and create a Channel Overview canvas
      • Provide a short description (can be the same as in GitHub project)
      • Include links to the GitHub and Asana
  • Open Asana and create a new project

    • The naming convention is Proj - <<project name>>
    • The Asana project is used to
      • Track non-technical issues (i.e., track work that doesn't easily map in terms of coding)
      • To track the project at higher level than GH
    • The Asana board is typically used by the project Team leader to communicate status to the other departments and Team leaders
    • E.g., on Asana we can do high level planning and track work that is not ready yet to be filed as GH Issues, similar to what we do with Google Docs
  • In general there is not a clear cut distinction between what goes in GH Project, GH Issues, Asana tasks, Google Docs planning

    • We agree that a GH Project includes many GH Issues
    • We agree that things can go in GH Project or in Asana tasks or in a Google Doc planning docs
    • We let people a bit of flexibility to do things however they are more comfortable
    • E.g., GP likes Google Docs to sketch out a project and track issues, Asana to track at high-level, and one Issue per "feature" when the Issue is ready to be executed

Special types of project#

  • Not all project need to have an explicit start and finish date

  • Each team (Infra/Devops, DataPull, ML ops etc.) should have their catch-all project to track the issues

Sprint process#

  1. Sprints run on Sunday to Saturday schedule - This is due to the fact that Friday is the preferred day to complete status updates - GitHub issue sprint field adheres to this convention

  2. Project owner creates a GitHub status update (by clicking on the Status button on the upper right in a given project) until 11 AM ET each Friday - The 11 AM deadline was chosen to facilitate easier completion of Asana status updates which have a 12 AM deadline - In practice the GitHub project status updates will often serve as the source of information for the Asana update - The status update should include the following sections: - Summary (what was accomplished, what kind of obstacles did the team run into) - Next steps (explain work for the next 1-2 sprints) - Example update:

            ```text
                Summary
                - We have finished updating ETL pipeline for historical bid/ask data
                    for additional symbols (the work started two sprints ago)
                - We have started to run daily scheduled live trading runs (low
                    volume, short runs) using one of our off-the-shelf models
                    - This is a major step forward for the team as it involved
                        collaboration between all engineering departments
                    - The runs were completed successfully from start to finish for the
                        last couple of days
                - The orderbook related ETL and backtest pipelines encountered some
                    unexpected obstacles (code-base related). It took a bit more time
                    than expected to resolve them, but it didn't take us off track.
    
                Next steps
                - Increase the length of daily low-volume trading to exercise the
                    whole system from start to finish in a more rigorous manner and
                    catch some corner-case behavior (mainly with regards interaction
                    with exchange API)
                - Run back-test(s) for orderbook-based model(s)
                - Kick-off work on a new model
            ```
    
  3. The status update is sent to customers (either external or internal sending to all@)

  4. Project owner (or a TL) can ask other collaborators in the project to also add status updates if needed, before broadcasting, to make sure we manage expectations.

Automation#

Built-in workflows#

  • GitHub offers a handful of built-in workflows to automate frequently run actions within projects

    • For example: when an issue is closed, set the status to done
  • To open the workflows menu, click on the ... button in the upper right corner of the project view and select "Workflows"

  • In our base template we currently use these automated workflows

Github Actions automations#

  • For more customized automated workflows we use GitHub actions
  • A GitHub Action sprint_iteration.yml is set up to move items in active projects from last sprint to current sprint at the beginning of each sprint.
  • We have sync_gh_issue_labels.py to synchronize GitHub issue labels from a label inventory manifest file
  • We also have sync_gh_projects.py to compare a source GitHub Project (the template) with a destination project and ensures all global fields and views from the template exist in the destination

Parent and sub-issues#

  • GitHub offers sub-issues to breakdown complex or higher-level task into smaller chunks of works
  • Our current convention is not to use this feature